LRBa2023/1
RCT:kjf:ph
2011 - 2012 LEGISLATURE
ASSEMBLY AMENDMENT 2,
TO ASSEMBLY SUBSTITUTE AMENDMENT 1,
TO 2011 ASSEMBLY BILL 421
December 13, 2011 - Offered by Representative Tiffany.
AB421-ASA1-AA2,1,11 At the locations indicated, amend the substitute amendment as follows:
AB421-ASA1-AA2,1,3 21. Page 2, line 21: after "applications;" insert "issuance of air pollution control
3permits;".
AB421-ASA1-AA2,1,4 42. Page 31, line 17: after that line insert:
AB421-ASA1-AA2,1,5 5" Section 110d. 285.63 (1) (intro.) of the statutes is amended to read:
AB421-ASA1-AA2,1,86 285.63 (1) Requirements for all sources. (intro.) The department may
7approve the application for a permit required or allowed under s. 285.60 if it finds
8all of the following apply:
AB421-ASA1-AA2, s. 110h 9Section 110h. 285.63 (1) (a) and (b) of the statutes are consolidated,
10renumbered 285.63 (1) (a) and amended to read:
AB421-ASA1-AA2,2,811 285.63 (1) (a) Source will meet Permit ensures compliance with requirements.
12The stationary source will meet permit includes terms and conditions necessary to

1ensure compliance with
all applicable emission limitations and other requirements
2promulgated under this chapter, standards of performance for new stationary
3sources under s. 285.27 (1) and, emission standards for hazardous air contaminants
4under s. 285.27 (2); (b) Source will not violate or exacerbate violation of air quality
5standard or ambient air increment.
The, and the federal clean air act, including
6those terms and conditions necessary to ensure that the
source will not cause or
7exacerbate a violation of any ambient air quality standard or ambient air increment
8under s. 285.21 (1) or (2);
AB421-ASA1-AA2, s. 110p 9Section 110p. 285.63 (1) (d) of the statutes is amended to read:
AB421-ASA1-AA2,2,1710 285.63 (1) (d) Source will not preclude construction or operation of other source.
11The permit includes terms and conditions necessary to ensure that the stationary
12source will not degrade the air quality in an area sufficiently to prevent the
13construction, reconstruction, replacement, modification or operation of another
14stationary source if the department received plans, specifications and other
15information under s. 285.61 (2) (a) for the other stationary source prior to
16commencing its analysis under s. 285.61 (3) for the former stationary source. This
17paragraph does not apply to an existing source required to have an operation permit.
AB421-ASA1-AA2, s. 110t 18Section 110t. 285.63 (7) (a) of the statutes is amended to read:
AB421-ASA1-AA2,2,2219 285.63 (7) (a) Subject to the conditions and restrictions specified in this
20subsection, the department shall grant use of the growth accommodation as a means
21for a stationary source to comply with either sub. (1) (b) (a) or (2) (a), or both subs.
22(1) (b) (a) and (2) (a).".
AB421-ASA1-AA2,3,3 233. Page 31, line 20: delete lines 20 and 21 and substitute "modeling when
24issuing a permit under this chapter. The department may not require air dispersion

1modeling before issuing a permit under this chapter for a minor source. The
2department may not require air dispersion modeling as a condition of coverage under
3a registration permit or general permit under this chapter.".
Loading...
Loading...